CONSTRUCTION PROCESS
Once we have used our synergy to choose the right home for you and your
family, the rough draft is sent to the factory for precision engineering. Within a few days, the stamped prints are returned showing your house just how you imagined.
When the floor plan has been signed off by you a 20% deposit is
required to schedule the home for production. Once built, the home is
delivered in modules. The modules will be set on your foundation with a crane. When all the sections are together, your home will be about 70% complete, depending on the type, design, and options selected.
Cherokee Homes has our own in-house construction crews that keep your home on schedule because there are no worries about sub-contractor no-shows or scheduling problems.
BELOW IS A SAMPLE CONSTRUCTION SCHEDULE
LAND/LOT DEVELOPMENT
- Purchase
- Clear Title (if not already owned)
- Accessible to modular transporter (conduct site evaluation prior to purchase if not already owned)
- Perk/Probe Test (or public sewer if available) conduct prior to purchase if not already owned
- Land Surveyed (if not already owned)
FORMS/PROCEDURES/PERMITS
- Select home, options ($500 non-refundable deposit is due at this time)
- Develop and finalize prints, plans, options, finishes and specs ($300 of
your deposit is used to draw engineered plans of your new home)
- Contracts Signed
- Sign-off on plans and specs
- Secure Financing
- Set target occupancy date
- Establish construction activities/schedule
- Obtain and post permits
- Building
- Electrical
- Plumbing
- Mechanical
- Road/Culvert
- Application for Gas/Electrical Service
- Site Survey (stake out)
FOUNDATION AND SITEWORK
- Order steel beams and columns
- Deliver dumpster and port-a-potty
- Site preparation, remove obstacles
- Layout and excavation
- Form footings
- Pour footings
- Footing inspection
- Install footing drains and basement stone
- Install under slab utilities
- Block delivery/foundation systems
- Construct/Install foundation walls
- Inspect foundation drains
- Apply foundation damp-proofing and vapor barrier
- Install anchor clips/bolts, sill plate and sealer
- Install sump pump crock and rough plumbing
- Install Basement windows (if ordering a basement)
- Install Foundation drain tile and cover
- Prep opening in floor for posts/support columns
- Pour basement floor
- Backfill
SITE PREPARATION
- Foundations and footings are completed
- Foundation is square and level
- Foundation and footings have passed inspection
- Obstacles for crane and transporters have been removed
- Access route for crane and transporters is planned
- Crane pad is ready and firm
- Set crew and crane schedules are confirmed
- Bulldozer and operator scheduled and confirmed
- Utility crews have been scheduled for turn-off/turn-on (if applicable)
- Weather forecast for set day looks adequate
- Payment for delivery day confirmed and available
HOME DELIVERY AND SET
- Modules delivered
- Inventory and ship-loose materials checked for accuracy
- Set Crew begins to unwrap modules, mark foundation for mating walls,
prepare for lifting
- Once module is set, it is checked and fastened
- Mating Surfaces prepared
- Wires, Pipes, Ducts and Stairs prepared
- Posts/Support Columns Set/Installed
- Stairs to Basement Set/Installed
- Lift roof sections with crane
- Lift Dormers and other roof elements
- Make home weather-tight and secure
EXTERIOR FINISHING
- Siding completed
- Masonry work completed
- Install chimney stack (if ordered)
- Install gutters and downspouts
- Porches, decks and patios completed
INTERIOR
- Install electrical, plumbing, HVAC units
- Inspection
- Finish/Patch drywall
- Finish Interior Trim and Doors/Adjust
- Install or Seam flooring
- Clean-Up
EXTERIOR
- Install exterior lights and bulbs
- Final Grading
- Exterior Clean-up - removal of dumpsters and Port-a-potty
HANDING OVER THE KEYS!
- Punch List
- Walk through with customer
- Final Inspection
- Certificate of Occupancy
- DELIVERY OF YOUR DREAMHOME KEYS!
|
 |